kWh Lithium Ferro Phosphate (LFP) Installation

Rev. 1.8
505 Keystone Rd, Southampton, PA 18966, USA . (877) 497 6937. sales@fortresspower.com .
www.fortresspower.com
15
Positive and negative battery cables. It is recommended to install a 150A fuse
between the bus bar and the battery. We recommend copper cables larger than AWG
2/0. The battery cables are not included. Please refer to the published Battery Cable
Sizing Chart for the proper size, based on your system specification.
Positive and Negative Terminal lug recommendation: M8 (diameter: 8mm or 5/16in)
Screwdriver
Communication Bus Terminator: to Match Impedances during parallel setup
RS 485 cable
RECOMMENDED: Small 48V Charger for trickle-charge purposes
OSHA approved personal protective equipment
4.2 Inspection before Installation
Check the battery package, type, quantity, appearance and other components
Check if there is any damage on the battery box
Check the battery terminals and connections to make sure they are clean, free of dirt,
fluids and corrosion
Check the Open Circuit Voltage.
o Set the battery on a clean working space.
o Make sure the + and - terminals are not contacting anything.
o Locate the eFlex Power Button and press it momentarily. Wait for ~10 seconds for
the LED self - diagonstic to complete.
o Confirm that the LED lights are green (there should be statement here on what the
operator should see once the eFlex is turned on and operating normally.
o Using a Voltage Meter check that the voltage across the terminals is between 50V-55V.
If Voltage is <50V, charge the battery using an approved battery charger.
If the Voltage is >55V, contact Fortress Power.
IMPORTANT NOTE: Please inform us of any problems within 7 days of receipt of goods.
Otherwise, we deem that clients have no objection to the goods.
Insulated gloves
Safety Glasses
Safety Shoes