Installation Guide
Second Post Installation
 • Insert Post into post hole.
 • Temporarily insert the rail ends into the post.
 • Place a level on top rail of fence panel to check for level.
 • Make adjustments to unlevel panel by adding gravel under post
 • Once level depress Poly-Loc Clips and insert rail into post.
 • Rail is installed when Rail Notch contacts post.
 • Do not fill holes with concrete 
Begin Post and Panel Installation
 • Starting at a corner, dig first post hole to required depth.
 • Fill hole with 3” of compacted pea gravel or crushed stone.
 • Insert Corner Post in post hole and check post depth.
 • Insert ends of rails into the post holes.
 • Rotate Poly-Loc Clip downward.
 • Depress Poly-Loc Clips and insert rail into post 
 • Rail is installed when Rail Notch contacts post. 
 • Confirm second post hole location and dig post hole.
Poly-Loc Clip 
Post Cut Away
Rail 
Notch
Continue Post and Panel Installation
 • Continue process of confirming and digging post holes as panels are installed.
 • Fill posts holes with compacted gravel and check post height.
 • Install and level panels.






