Instructions / Assembly
Second Post Installation
• Insert Post into post hole.
• Temporarily insert the rail ends into the post.
• Place a level on top rail of fence panel to check for level.
• Make adjustments to unlevel panel by adding gravel under post
• Once level depress Poly-Loc Clips and insert rail into post.
• Rail is installed when Rail Notch contacts post.
• Do not fill holes with concrete
Begin Post and Panel Installation
• Starting at a corner, dig first post hole to required depth.
• Fill hole with 3” of compacted pea gravel or crushed stone.
• Insert Corner Post in post hole and check post depth.
• Insert ends of rails into the post holes.
• Rotate Poly-Loc Clip downward.
• Depress Poly-Loc Clips and insert rail into post
• Rail is installed when Rail Notch contacts post.
• Confirm second post hole location and dig post hole.
Poly-Loc Clip
Post Cut Away
Rail
Notch
Continue Post and Panel Installation
• Continue process of confirming and digging post holes as panels are installed.
• Fill posts holes with compacted gravel and check post height.
• Install and level panels.