Installation Manual
PREPARE HOT WATER LINE AND 
POWER CORD HOLE
Water Line Connection
The line may enter from either side, rear or floor within the shaded 
area shown in Figure F.
Each cut an additional 1-4/5” dia. hole to accommodate the water 
line and the power cord.
Figure F
Shut-off 
Valve
1-4/5" Dia.
Hole
1-4/5" Dia.
Hole
Hot 
Cabinet Face
A
B
Turn off the water supply.
Install a hand shut-off valve in an accessible location, such 
as under the sink. (Optional, but strongly recommended 
and may be required by local codes.)
Connect one end of inlet line(A) to the 3/4-inch FHT(B) and 
connect to the dishwasher.
Run the other end of the inlet line through the hole in the 
cabinet. If the shut-off valve is 3/8 inch I.D., the inlet line 
can be directly connected to the shut-off valve.
Adjust water heater for 120°F to 150 °F temperature.
Flush water line to clean out debris.
The hot water supply line pressure must be 6-145 PSI.
Opening the door will cause the dishwasher to tip forward. Do 
not open the door until you are ready to install the dishwasher. 
If it is necessary to open the door, hold the top of the 
dishwasher securely with one hand and hold the door with the 
other hand.
CAUTION:
8
INSTALLATION PREPARATION
DISHWASHER SETUP










