Installation Instructions
Set Screw
50mm
(1-
31
/32”)
70mm
(2-
3
/4”)
100mm
(3-
15
/16”)
Remove the Anti-Jump Screw from each Door Hanger.
IMPORTANT
The widest part of the Spacer should be placed on the
wall.
The Joint Plate should be on the side of the Track facing
away from wall, and on the BOTTOM of the Track.
Place one Lag Screw through the hole on one end hole of
the Track, through a Spacer, and drive the Lag Screw into the pilot hole. DO NOT fully tighten
Lag Screw.
Repeat process for Lag Screw on opposite end of Track. DO NOT fully tighten Lag Screw.
For remaining holes in Track, insert Lag Screw through hole and through Spacer, and drive into
pilot hole. DO NOT fully tighten Lag Screws.
After all Lag Screws and Spacers are in place, use a level on top of the Track to make sure it is
properly level. While the level is on top of the Track, tighten all Lag Screws.
3 - Install Hangers and Hang the Door
IMPORTANT
If the Track Stops will be located between the outermost
Lag Screw holes, they should be placed loose on the
Track at this time.
Place the Track Stop with the rubber bumpers facing the
center of the Track and the Set Screws facing UP.
Mark the location of the
through holes for the
Door Hangers on the side
of the door facing away
from the Track as shown
in the diagram. Drill
the holes using a 10mm
(
7
/16”) bit.
Insert the Bolts through the
door on the side facing
the Track, and secure the Door Hanger by adding
two Washers and an Hex Nut to each Bolt.
Hand tighten both Nuts before securing with a
wrench.




