Installation Guide
16
STEP 14
1. Caulking, and not allow to open & close the door within 24 hours.
STEP 14
1. Caulking, and not allow to open & close the door within 24 hours.
Lagoon Double Roller Door
FINAL STEP: Caulk the inside sides of the shower door
frame to seal. Keep the entire area dry for a minimum of
24 hours. Your installation is now complete.
24 H
Left Hand Assembly
Right Hand Assembly
®
FINAL STEP: Caulk the inside sides of the shower door
frame to seal. Keep the entire area dry for a minimum of
24 hours. Your installation is now complete.
24 H