Horizon Elite™ Ice Machine Models with RIDE® Technology Installation Instructions for Harmony™ or 110CM Symphony™ Plus Applications HCD/HMD/HCF/HMF1810RHS, HCD/HMD/HCF/HMF2110RHS, HCD/HMD1810NHS, HCD/HMD2110NHS (See model number configurator on page 2 for details.) Order parts online www.follettice.
Chewblet® Ice Machine Model Number Configurations HC Icemaker MC Maestro™ Chewblet® (425 Series) HC Horizon Chewblet (710, 1010, 1410, 1810, 2110 Series) HM Horizon Micro Chewblet Voltage D 1810 A V Series 425 up to C 208-230/60/1 (icemaking head) Self-contained only. 425 lbs D 115/60/1 (icemaking head) (193 kg) Self-contained and remote. If remote 710 up to unit, high side is 208-230/60/1. 675 lbs E 230/50/1 (icemaking head) (306 kg) Self-contained only.
Read and complete the following 8 installation steps 1 3 5 7 Unpack Dispenser preparation Ice transport tube Internal connection 2 4 6 8 Site preparation Louvered docking assembly External connection Front cover HARMONY and Symphony Plus • RIDE Technology remote 3
Carefully unpack and inspect the contents of your Follett ice machine. 1.
Site preparation Prepare the installation site. 2 Provide drainage, water supply and electrical power to within 6 feet (2m) of ice machine in accordance with local and national codes. Outdoor installation of low side is not recommended and will void warranty. 2.1 2.1 Installation site requirements NEMA 5-15 ➊ ➋ ➌ ➌ 2 ft. x 1" OD silicone tubing ➎ 3/8" ∅ (9,5mm) ➍ 7/8" ∅ (22.
Dispenser preparation Prepare the dispenser. 3 Attention! The location of the hole in the dispenser top is dependent on the type of dispenser. Be sure to follow Step 3.1 for the appropriate dispenser. 3.1 Hole location - Harmony (Lancer, Cornelius or Servend), or 110CM Symphony Plus Lancer Sensation and Touchpoint Back of Top Standard (Cornelius, Lancer, or Servend) 9.00" 110CM Symphony Plus Back of Top 5" (127 mm) 10.00" 5" (127 mm) 5" (127 mm) 3.0" ∅ (77,2 mm) 3.0" ∅ (77,2 mm) 3.
3.2 3.3 Top preparation Top preparation ➋ ➊ ➌ ➊ • Remove protective tape from gaskets • Apply gaskets ➊ • Install shuttle actuator ➋ through dispenser top and secure with locking nut ➌ 3.4 3.5 Top preparation Agitation adjust. – CORNELIUS ON ➋ OFF ➊ • Screw 4" (102 mm) extension bottom of shuttle actuator ➋ ➊ into Cornelius models ED, DB, DF, IDC and FLAVOR FUSION Adjust the agitation timer located on the Cornelius PC board to 1 second on, 1 hour off.
PRESS IN ON THIS SIDE TO TURN SWITCH ON. AGITATION TIME CO N SWITCH NUMBER 3 O O X X 4 O X O X 1 OFF SE D CO ND 3 SE S CO ND 4 SE CO S ND S ROCKER SWITCHES (VIEW LOOKING DOWN) SE PRESS IN ON THIS SIDE TO TURN SWITCH OFF. Agitation adjustments – LANCER 4500 SERIES 1 2 3 X = ON O = OFF 2 3.
3.8 Agitation adjustments – LANCER FS SERIES Initialization Screen (Boot Up Only) Lancer FS-16 Ver. 0.
3.
3.11 Dispenser diverter plate installation – CORNELIUS ED, DF and DB SERIES GATE MOUNTING PLATE STORAGE HOPPER FLANGE EXTENDS INTO STORAGE HOPPER THROUGH GATE OPENING ICE DIVERTER ICE CHUTE COVER APPLY RTV TO THIS SURFACE TO SEAL TO HOPPER GATE MOUNTING PLATE 10-32 WASHER GASKET ICE CHUTE Cornelius ED, DF and10-32 DB NUT series only These dispensers require the installation of an ice diverter at the dispenser opening.
Louvered docking assembly Install the louvered docking assembly. 4 BEFORE PROCEEDING Prior to installing the louvered docking assembly, ensure that the drain fitting is oriented (right or left) correctly for your installation. An optional straight drain fitting is also supplied. You may need to remove the back panel of the docking assembly in order to re-orient or change the drain fitting. Replace back panel prior to mounting the docking assembly.
4.2 Undercounter installation requirements Top View ➌ CROSSBRACE Access panel/ door on counter ➊ 3.25" (83 mm) min. 23.5" min. (59.7 mm) 24" min. (61 mm No Lip ➋ DOCKING STATION • Prior to installing the louvered docking assembly, ensure that the drain fitting is oriented (right or left) correctly for your installation. An optional straight drain fitting is also supplied. You may need to remove the back panel of the docking assembly in order to re-orient or change the drain fitting.
Transport tube Install the transport tube. 5.1 5 Transport tube installation. ➋ ➍ Hot Water 160 F (71 C) ➎ ➏ ➐ ➑ ➒ ➓ ➊ ➌ 1/4" 1' Ice transport tube tips • Insulate entire length of ice transport tube ➊ • Secure ice transport tube ➋ as needed to prevent dips and traps from forming. For long tube runs see guide on page 19. • Pitch ice transport tube at least 1/4" per foot (6,4mm/.
External connections Connect utilities to louvered docking assembly. 6.1 6.2 Water and drain 6 Refrigerant ➊ ➋ ➊ ➌ ➏ Minimum 8" radius 2 ft. x 1" OD silicone tubing 3/4" barb x 3/4" FPT ➍ • Braze supplied quick-connect lines onto stub-ins ➊. 3/4" MPT x 1" slip ➎ 1" Stand pipe/Drain • Rough-in ice machine potable water supply ➊. 3/8” push-in connection will be made at shut-off valve inside machine • Remove access panel if necessary ➋.
Connect louvered docking assembly to ice machine. 7.1 Ice transport tube installation 7.2 Internal connections 7 Water line ➋ ➊ ➊ • Slide ice machine into louvered docking assembly ensuring that drain tube is fully seated on barbed drain fitting ➊ • Insert ice transport tube all the way into coupling and tighten nut firmly ➋ • Insert potable water line into valve 7.3 7.4 Refrigeration lines ➊ Power cord ➊ • Evacuate line set.
7.6 Power cord TDS switch CLEAN POWER ON HIGH LOW BIN MAKING ICE SLEEP CYCLE TIME DELAY LOW WATER MAINT/CLEAN SERVICE HIGH AMPS HIGH PRES TDS DRAIN CLOG CLEANER FULL 7.
Front cover Install front cover to ice machine. 8.1 8.2 Install condensing unit 8 Install ice machine front cover ➋ ➊ • Slide ice machine cover over machine ensuring that tabs on back of cover slip under louvers on back of louvered docking assembly ➊ • Insert and tighten two screws through cover and into louvered docking assembly • Complete installation of condensing unit or connection to rack system. • Required rack system capacity at 0 F (-18 C) evaporator (EPR supplied by installer).
Long tube run recommendations max. 2 ft (.6m) ➋ ➊ 1/4" 1' • Pitch ice transport tube to allow melt water to drain towards ice machine ➊ • Secure insulated ice transport tube at least every 2 ft (.
Horizon, Horizon Elite, Maestro, Harmony, Ice Manager, SafeCLEAN, Sani-Sponge and Vision are trademarks of Follett LLC. Chewblet, RIDE and Follett are registered trademarks of Follett LLC, registered in the US. 801 Church Lane • Easton, PA 18040, USA Toll free (877) 612-5086 • +1 (610) 252-7301 www.follettice.