Installation Instructions

13
DROP-IN • RIDE Technology remote condensing
Front cover
Install front cover to ice machine.
8
Install condensing unit
8.1
Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of louvered
docking assembly
Insert and tighten two screws through
cover and into louvered docking assembly
Install ice machine front cover
8.2
NOTICE
Ice machine MUST be sanitized prior to operation!
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
Complete installation of condensing unit
or connection to rack system.
Required rack system capacity at 0 F
(-18C) evaporator (EPR supplied by
installer).
1810N: 15,700 Btu/hr (3956 kcal/hr)
2110N: 18,200 Btu/hr (4586 kcal/hr)