Installation Instructions for RIDE Models

16
remote HARMONY and Symphony Plus RIDE Technology
Connect louvered docking assembly to ice machine.
7
Internal connections
Refrigeration lines
7. 3
Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain tting
Insert ice transport tube all the way into
coupling and tighten nut rmly
Ice transport tube installation
7. 1
Insert potable water line into valve
Water line
7. 2
Remove twist tie
Carefully pass cord thru opening and plug
into wall outlet
Power cord
7. 4
Evacuate line set.
Connect self-sealing liquid and suction
line ttings