Installation Instructions
16
remote condensing Cornelius • RIDE Technology
Front cover
Install front cover to ice machine.
9
• Complete installation of condensing unit
or connection to rack system.
• Required rack system capacity at 0 F
(-18C) evaporator (EPR supplied by
installer).
1010N: 7,700 Btu/hr (1940 kcal/hr)
1410N: 10,000 Btu/hr (2519 kcal/hr)
Install condensing unit
9.1
➋
➊
• Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of louvered
docking assembly
➊
• Insert and tighten two screws through
cover and into louvered docking assembly
➋
Install ice machine front cover
9.2
NOTICE
Ice machine MUST be sanitized prior to operation!
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.