Installation Instructions

9
ICE MANAGER remote condensing
Connect utilities to louvered docking assembly.
5
External connections
CAUTION
Plug must be accessible after nal installation.
Remove access panel if necessary.
Install drain line
.
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Rough-in ice machine potable water
supply
.
3/8” push-in connection will be made at
shut-off valve inside machine.
Apply Petrogel to barbed drain tting
Replace access panel.
Water and drain
5.1
Braze supplied expandable refrigerant
lines in place
Refrigerant
5.2