Installation Instructions
11
DROP-IN • RIDE Technology remote condensing
Connect louvered docking assembly to ice machine.
7
Internal connections
➊
• Braze refrigerant lines
➊
Refrigeration lines
7. 3
➊
➋
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain tting
➊
• Insert ice transport tube all the way into
coupling and tighten nut rmly
➋
Ice transport tube installation
7. 1
➋
➊
• Insert potable water line into valve
➊
Water line
7. 2
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
Power cord
7. 4