Installation Instructions

11
ICE MANAGER self-contained
• Insertpotablewaterlineintovalve
Potable water and drain lines
6.8
In
Out
• Installicemachinecoolingwaterlinesto
louvereddockingassembly
Cooling lines
6.6
• Slideicemachineintolouvereddocking
assemblyensuring that drain tube is fully
seated on barbed drain tting
• Inserticetransporttubeintocoupling
andtightennutfirmly
Ice transport tube
6.7
Water-cooled ice machines – follow steps 6.6 through 6.12.
CLEANER FULL
DRAIN CLOG
HIGH PRES
HIGH AMPS
SERVICE
MAINT/CLEAN
LOW WATER
TIME DELAY
SLEEP CYCLE
MAKING ICE
LOW BIN
POWER ON
CLEAN
TDS
HIGH
LOW
Set the TDS switch on the electrical box:
HIGH: for extended service life
LOW: for low-scale water
TDS switch
6.5