Installation Instructions
10
self-contained ICE MANAGER
Connect louvered docking assembly to ice machine.
6
Internal connections
Air-cooled ice machines – follow steps 6.1 through 6.5.
CAUTION
• Plug must be accessible after nal installation.
• Removetwisttie
• Carefullypasscordthruopeningand
plugintowalloutlet
Power cord
6.3
➊
➋
• Slideicemachineintolouvereddocking
assemblyensuring that drain tube is fully
seated on barbed drain tting
➊
• Inserticetransporttubeallthewayinto
couplingandtightennutfirmly
➋
Ice transport tube
6.1
➊
• Insertpotablewaterlineintovalve
➊
Potable water and drain lines
6.2
• Positionplateintoopeningandsecure
withsuppliedscrew
Power cord
6.4