Installation Instructions

6
Horizon Elite 710/1010/1410 HARMONY • RIDE Technology
3. Dispenser Top Preparation
WARNING!
§ Prior to installing the louvered docking assembly, ensure that the drain tting is oriented (right or left) correctly
for your installation. An optional straight drain tting is also supplied. You may need to remove the back panel
of the docking assembly in order to re-orient or change the drain tting. Replace back panel prior to mounting
the docking assembly.
§ Docking station must be secured in accordance with these instructions to ensure ice machine stability.
§ Ventilation openings in the louvered docking station should be clear of obstruction. Failure to do so could
result in damage to equipment.
§ Plug must be accessible after nal installation.
3.1 Top preparation 3.2 Install shuttle actuator
5"
(12,7 cm)
2.75 to 3"
(7 to 7,6 cm)
§ Locate shuttle actuator hole 5" (127mm) from back
of dispenser top.
§ Cut a 2.75" to 3" (7 to 7,6 cm) diameter hole in
dispenser top for shuttle actuator.
§ Apply gaskets
.
§ Install shuttle actuator
through dispenser top
and secure with locking nut
.