Installation Instructions

6
self-contained VISION • RIDE Technology
Prepare the dispenser.
3
Dispenser preparation
Ground
24"
(610 mm)
Mount the electrical box to the side of the Vision dispenser
to establish a ground connection.
Note: If a 4 x 4 box is mounted to a non-grounded surface, connect ground wire at an
appropriate ground.
Connect the bin signal plug on the electrical box to the bin signal cord on the bin
Insert 16" (609,6 mm) of the long bin signal cable
into the hole in the back of the louvered
docking station
and secure in place with strain relief provided.
After sliding the ice machine module into the louvered docking station, disconnect one wire from
shuttle switch and replace with wire from adapter plug.
Connect wire removed from shuttle switch to male connector on adapter plug wire.
Complete normal installation procedure for the ice machine using the installation manual that
shipped with the ice machine.
Connect adapter plug into bin signal plug.
2.1
Bin Signal Installation
3.1