Installation Instructions
6
self-contained VISION • RIDE Technology
Prepare the dispenser.
3
Dispenser preparation
Ground
➌
➋
➊
24"
(610 mm)
➌
➎
➏
➐
• Mount the electrical box to the side of the Vision dispenser
➊
to establish a ground connection.
Note: If a 4 x 4 box is mounted to a non-grounded surface, connect ground wire at an
appropriate ground.
• Connect the bin signal plug on the electrical box to the bin signal cord on the bin
➋
• Insert 16" (609,6 mm) of the long bin signal cable
➌
into the hole in the back of the louvered
docking station
➍
and secure in place with strain relief provided.
• After sliding the ice machine module into the louvered docking station, disconnect one wire from
shuttle switch and replace with wire from adapter plug.
➎
• Connect wire removed from shuttle switch to male connector on adapter plug wire.
➏
• Complete normal installation procedure for the ice machine using the installation manual that
shipped with the ice machine.
• Connect adapter plug into bin signal plug.
➐
2.1
Bin Signal Installation
3.1