Owners Manual

7
C. Installing base section
(IceDevIce models with SmartCART 75, 125, Cambro* ICS125, bagger accessory or correctional
package)
1. Remove screws holding base to skid and remove skid.
2. Position base in intended position and adjust feet to level in both directions.
3. For models with SmartCART 75: Adjust feet and level base so that there is no interference between
base and cart when cart is rolled under base with lid closed.
4. Mark position of each anged foot anchoring hole.
5. Move base section out of the way and install anchors for 1/4" bolts in oor (supplied by others).
6. Reposition unit in its intended position.
7. Anchor base unit to oor through anged feet.
8. Anchor base to wall using brackets and fasteners (supplied by others).
9. Use holes in side of base section to connect brackets.
10. Mark hole locations on wall.
11. Drill holes if needed.
12. Fasten brackets to base and wall.
D. Installing single section bin
(for IceDevIce models with SmartCART 75, 125, Cambro ICS125 or bagger accessory)
1. Remove all packaging material from bin.
2. Remove any accessories packed inside bin.
3. Remove top from bin.
4. Lay bin on its back being careful to protect nish, and remove bolts holding skid to bin.
5. Install bin section on base.
6. Place supplied 1-3/4" washers on supplied bolts and install bolts up through base and into bin at each
corner. Do not use skid bolts.
7. For model DEV2250 only, use supplied plugs to close bolt holes in bin back to prevent contamination of
insulation.
8. Remove protective covering from exterior.
9. Reinstall top onto bin.
10. Use supplied screws with power driver to install tool bracket in holes on either side of Ice•DevIce.
11. Mount icemaker(s) on top of bin section in accordance with icemaker manufacturer's instructions.
12. For models COR base must be bracketed to wall.
E. Installing two-section bins
(for IceDevIce models with SmartCART 75, 125, Cambro ICS125 or bagger accessory)
1. Remove all packing material from both sections
of bin.
2. Remove any accessories packed inside lower section
of bin.
3. Set lower section upright and remove bolts holding
skid to back of bin.
4. To prevent contamination of insulation, use supplied
plugs to close bolt holes in bin back.
5. Install bin on base.
6. Place supplied 1-3/4" washers on supplied bolts and
install bolts up through base and into bin at each
corner. Do not use skid bolts.
7. Remove protective covering from stainless steel
surfaces.
8. Using provided caulking gun and one of two (2) 10
oz tubes of sealant provided, run a 1/8" (3mm) bead of silastic sealant over center of each band of
gasketing on lower section, including over brackets (Fig.1).
9. Remove bolts holding skid to upper section back and close holes with supplied plugs.
10. Position upper section over lower section.
* Cambro is a registered trademark of Cambro Manufacturing Company in the United States and other countries.
lower
section
gasket
bead of sealant
gasket
Fig. 1
upper
section