Owner's Manual

Horizon 1000R/N Ice Machines 21
Fig. 22
11. Reconnect transport tube to louvered docking assembly.
12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing as shown.
Fig. 23
14. Apply a coat of petrol-gel to the auger shaft.
15. Install gearmotor, making sure that insulation is properly
seated between gearmotor and main housing as shown.
16. Firmly tighten four gearmotor bolts in place.
Apply
petrol-gel
Fig. 24
14. Insert a bolt into the auger shaft and  nger tighten.
15. Using a wrench, rotate the shaft clockwise to align the
keyways in the gear housing and the shaft so as to
accept the key.
16. Insert the key into the keyway.