NetDAQ Users Manual
Table Of Contents
- 2640A/2645A NetDAQ Users Manual
- 1. Overview
- 2. Preparing for Operation
- Introduction
- Instrument Preparation
- Unpacking and Inspecting the Instrument
- Positioning and Rack Mounting
- Connecting to a Power Source and Grounding
- Universal Input Module Connections
- Digital I/O Connections
- Alarm/Trigger I/O Connections
- External Trigger Wiring for a Group Instrument
- Controls and Indicators
- Front Panel Operating Procedures
- Power-On Options
- Displaying a Monitor Channel
- Displaying the Digital I/O Status
- Displaying the Totalizer Status
- Reviewing and Setting the Base Channel Number
- Reviewing and Setting the Line Frequency
- Reviewing and Setting the Network Type
- Reviewing and Setting the General Network Socket Port
- Reviewing and Setting the General Network IP Address
- Reviewing and Setting the Subnet Mask and Default Gateway
- Viewing the Instrument Ethernet Address
- Host Computer and Network Preparation
- Testing and Troubleshooting
- 3. Configuring NetDAQ Logger for Windows
- Introduction
- Configuring Network Communications
- Configuring the Current Setup
- Setup Files
- Configuring an Instrument
- Configuring Channels
- Configuring Mx+B Scaling From a File
- Entering an Instrument's Description
- Copying a Channels Configuration
- Default Configuration Settings
- Using Configuration Lockout
- Saving an Instrument's Configuration as a Text File
- Configuring the netdaq.ini File
- 4. Operating NetDAQ Logger for
- 5. Using Trend Link for Fluke
- Introduction
- Getting the Right Look for Your Trend Link Chart
- 6. Maintenance
- Introduction
- Self-Test Diagnostics and Error Codes
- Cleaning
- Fuse Replacement
- Performance Test
- Configuring the Performance Test Setup
- Initializing the Performance Test Setup
- Accuracy Performance Tests
- Volts DC Accuracy Test (2640A)
- Volts DC Accuracy Test (2645A)
- Volts AC Accuracy Test
- Frequency Accuracy Test
- Analog Channel Integrity Test
- Computed Channel Integrity Test
- Thermocouple Temperature Accuracy Test
- Open Thermocouple Response Test
- 2-Wire Resistance Accuracy Test (2640A)
- 2-Wire Resistance Accuracy Test (2645A)
- 4-Wire Resistance Accuracy Test (2640A)
- 4-Wire Resistance Accuracy Test (2645A)
- RTD Temperature Accuracy Test (Resistance) (2640A)
- RTD Temperature Accuracy Test (Resistance) (2645A)
- RTD Temperature Accuracy Test (DIN/IEC 751 RTD)
- Digital Input/Output Tests
- Totalizer Tests
- Master Alarm Output Test
- Trigger Input Test
- Trigger Output Test
- Calibration
- Variations in the Display
- Service
- Replacement Parts
- Appendices
- A. Specifications
- Introduction
- 2640A/2645A Combined Specifications
- 2640A Specifications
- 2640A DC Voltage Measurement Specifications
- 2640A AC Voltage Measurement Specifications
- 2640A 4-Wire Resistance Measurement Specifications
- 2640A 2-Wire Resistance Measurement Specifications
- 2640A RTD's 4-Wire, per ITS-1990 Measurement Specifications
- 2640A RTD's 2-Wire per ITS-1990 Measurement Specifications
- 2640A Thermocouple per ITS-1990 Measurement Specifications
- 2640A Frequency Measurement Specifications
- 2645A Specifications
- 2645A DC Voltage Measurement Specifications
- 2645A AC Voltage Measurement Specifications
- 2645A 4-Wire Resistance Measurement Specifications
- 2645A 2-Wire Resistance Measurement Specifications
- 2645A 4-Wire RTD per ITS-1990 Measurement Specifications
- 2645A Thermocouple per ITS-1990 Measurement Specifications
- 2645A Frequency Measurement Specifications
- B. Noise, Shielding, and Crosstalk Considerations
- C. True-RMS Measurements
- D. RTD Linearization
- E. Computed Channel Equations
- F. Data File Format
- G. Dynamic Data Exchange (DDE)
- H. Ethernet Cabling
- I. Network Considerations
- J. Error Messages & Exception Conditions
- K. Fluke Service Centers
- A. Specifications
- Index
- Instrument Parameter Record (Isolated Network)
- Instrument Parameter Record (General Network)
- General Network Parameter Record
- Host Computer General Network Parameter Record

2640A/2645A NetDAQ
Users Manual
6-6
Performance Test 6-5.
When received, the 2640A/2645A is calibrated and in operating condition. The
following Performance Test procedures are provided for acceptance testing upon
initial receipt or to verify correct instrument operation. The performance tests
must be performed in sequence.
If the instrument fails a performance test, the instrument requires service or
repair. To perform these tests, you will need a Fluke 5700A Multifunction
Calibrator and several other pieces of equipment meeting the minimum
specifications given in Table 6-2.
Each of the measurements listed in the following steps assume the instrument is
being tested after a 1/2 hour warm-up, in an environment with an ambient
temperature of 18 to 28°C, and a relative humidity of less than 70%.
Warning
The 2640A/2645A instrument contains high voltages that
can be dangerous or fatal. Only qualified personnel
should attempt to service the instrument.
Configuring the Performance Test Setup 6-6.
Configure the performance test setup as described below. The performance test
requires a complete network connection between the host computer and
instrument under test, including a host computer Ethernet interface and
installation of NetDAQ Logger. If you have not yet configured and tested a
network connection for the host computer and instrument, complete the
appropriate installation procedure for your network configuration before
conducting any performance testing.
1. Connect the Instrument and the Host Computer Connect the supplied
50-ohm coaxial cable, with a BNC "T" or "Y" and 50-ohm terminator,
between the host computer BNC Ethernet port and the instrument BNC
Ethernet port. The 50-ohm terminator with the ground lead is used at the
instrument with the terminator ground lug connected to the ground terminal
adjacent to the BNC port (Figure 6-2). See Chapter 2 for other interconnection
methods.
2. Connect the 5700A to Channel 1 Connect a cable from the Output VA HI
and LO connectors of the 5700A to the Universal Input Module terminals for
channel 1 connecting the 5700A HI to terminal H and LO to terminal L. Insert
the Universal Input Module into the instrument under test (Figure 6-3).