User Manual

1) A window appears with the statement of the assignment for the
read in measurements.
"Assign the measurement to:" window
2) Enter the customer, the installation and the test to which the read
in measurements should be assigned. Select sample customer,
example 1 and initial test and confirm with "Continue".
The automatic assignment of the measurement result to the
distributions and current circuits can take place only if the dis-
tribution and current circuit codes were entered correctly cor-
responding the current circuit list.
Assignment of the measurements to distri-
bution and current circuits
A list with the read in measurements now appears.
"Read in data" window
1) Click on the "Process data" button and the read in data are ac-
cepted in the Fluke DMS database.
2) Then click on the "Close" button, to close the window:
3) Check the assignment of the measurements to the distribution
and the individual current circuits in the database, to do this se-
lect sample customer, example 1, initial test, '001 meter cabinet
with distribution field' and 001 1F1 back-up fuse'.
Quick Reference Guide
Example for Fluke DMS 0100/INST
34