Operation Manual

Chapter 3: Test Results
View Saved Results
51
Note
These numbers show the total number of results
that passed and failed in the IDs saved. So, the
numbers can be more than the number of IDs
saved.
The cable IDs that have FAIL results and must be tested again.
Because some IDs can have one or more tests that failed, the
number at the top of this screen (
) can be more than the
number of retests needed.
The cable IDs that have measurements within the range of
accuracy uncertainty for the tester. See “PASS*/FAIL* Results” on
page 40.
The cable IDs that have an overall PASS or result. Because
some IDs can have one or more tests that passed or have an
status, the number at the top of this screen (
) can be more
than the number of passes.
Tap VIEW ALL to see a summary of the results in all the projects
in the tester.
TRANSFER lets you export or import results to or from a flash
drive and delete results on the flash drive.
MANAGE lets you move results to a different project, rename
results, or delete results that are in the tester.
The scroll bar shows when the list of results is long. To use the
scroll bar, tap on the bar or slide your fingertip on the bar. For
example, to see the 12th result in the list, tap on “12” in the
scroll bar. When you slide your fingertip on the bar, the number
of the result you can see is next to your fingertip.
Tap the ID/Date control to sort the results by cable ID or by date.
When you sort by ID, the results show in ascending order. When
you sort by date, the latest result is at the top of the list.
riešenia na presné meranie
http://www.elso.sk