Instructions
Table Of Contents
- DSX-600 Users Manual
- LIMITED WARRANTY AND LIMITATION OF LIABILITY
- Contents
- List of Figures
- Chapter 1: Get Acquainted
- Overview of Features
- Contact Fluke Networks
- Register Your Product
- Technical Reference Handbook
- Additional Resources
- Supplements and Updated Manuals
- Kit Contents
- Symbols
- Safety Information
- Connectors, Keys, and LEDs
- About Link Interface Adapters
- AC Adapter and Battery
- Verify Operation
- How to Use the Touchscreen
- Change the Language
- Buttons to Do Tests and Save Results
- Overview of Memory Functions
- Options for Cable IDs
- About LinkWare Applications
- Chapter 2: Certify Twisted Pair Cabling
- Chapter 3: Certify Coaxial Cabling
- Chapter 4: Manage Test Results
- Chapter 5: Use Projects
- Chapter 6: Sync Projects with LinkWare™ Live
- Sign Up for a LinkWare Live Account
- How to See the Tester’s MAC Address
- Use LinkWare Live Through a Wired Ethernet Network
- Use LinkWare Live Through a Wi-Fi Network
- When You Cannot Sync a Deleted Project
- About the Asset Management Service
- Change the Network Settings
- Sign Your Tester Out of LinkWare Live
- Sign In to LinkWare Live from a Desktop or Mobile Device
- Import Projects from LinkWare Live into LinkWare PC
- Learn More About LinkWare Live
- Chapter 7: Maintenance
Chapter 4: Manage Test Results
View Saved Results
71
: The number of DSX CableAnalyzer results that have PASS*
results. PASS* results have measurements within the range of
accuracy uncertainty for the tester. See “PASS*/FAIL* Results” on
page 42.
The cable IDs that have FAIL results and must be tested again.
The cable IDs that have an overall PASS or result.
Tap VIEW ALL to see a summary of the results in all the projects
in the tester.
TRANSFER lets you export or import results to or from a flash
drive and delete results on the flash drive. The TRANSFER
function also lets you sync project setups and results with
LinkWare Live.
MANAGE lets you move results to a different project, rename
results, or delete results that are in the tester.
The scroll bar shows when the list of results is long. To use the
scroll bar, tap on the bar or slide your fingertip on the bar. For
example, to see the 12th result in the list, tap on “12” in the
scroll bar. When you slide your fingertip on the bar, the number
of the result you can see is next to your fingertip.
Tap the ID/Date control to sort the results by cable ID or by date.
When you sort by ID, the results show in ascending order. When
you sort by date, the latest result is at the top of the list.
These icons show when you connect the tester to a network
to use Fluke Networks cloud services (see Chapter 6):
The tester is connected to a wireless network.
The tester is connected to a wired network.
The asset management icon shows when the owner of a
LinkWare Live account has enabled the asset management
service on the tester. See “About the Asset Management Service”
on page 93.










