Instructions
Table Of Contents
- DSX-600 Users Manual
- LIMITED WARRANTY AND LIMITATION OF LIABILITY
- Contents
- List of Figures
- Chapter 1: Get Acquainted
- Overview of Features
- Contact Fluke Networks
- Register Your Product
- Technical Reference Handbook
- Additional Resources
- Supplements and Updated Manuals
- Kit Contents
- Symbols
- Safety Information
- Connectors, Keys, and LEDs
- About Link Interface Adapters
- AC Adapter and Battery
- Verify Operation
- How to Use the Touchscreen
- Change the Language
- Buttons to Do Tests and Save Results
- Overview of Memory Functions
- Options for Cable IDs
- About LinkWare Applications
- Chapter 2: Certify Twisted Pair Cabling
- Chapter 3: Certify Coaxial Cabling
- Chapter 4: Manage Test Results
- Chapter 5: Use Projects
- Chapter 6: Sync Projects with LinkWare™ Live
- Sign Up for a LinkWare Live Account
- How to See the Tester’s MAC Address
- Use LinkWare Live Through a Wired Ethernet Network
- Use LinkWare Live Through a Wi-Fi Network
- When You Cannot Sync a Deleted Project
- About the Asset Management Service
- Change the Network Settings
- Sign Your Tester Out of LinkWare Live
- Sign In to LinkWare Live from a Desktop or Mobile Device
- Import Projects from LinkWare Live into LinkWare PC
- Learn More About LinkWare Live
- Chapter 7: Maintenance
DSX-600 Series CableAnalyzer
Users Manual
26
BK110.EPS
Figure 9. The Home Screen
PROJECT: The project contains the settings for a job and helps
you monitor the status of a job. When you save test results, the
tester puts them in the project. Tap the PROJECT panel to edit
the project settings, select a different project, or make a new
project.
Shows a summary of the test results in the project:
: The number of tests that passed.
A
E
B
F
K
J
C
G
H
D
LMN
I










