Manual
14of16 MN301040 RevB
INSTALLATION StepTen
TheLD31/LD32seriesisdesignedtooperatewhilesubmergedintheactualapplication
liquid.Avoid installing the level transmitter along the bottom of the tank is materials
such as sludge will build up and coat/cover the transmitter.This also includes any
debristhat will settle along the bottom of the tank.In these applications, it is best to
suspendthetransmitterabovethehighestlevelofsludge/debristhatwilloccur.
1. Location: Select a location where the temperature of the transmitter will be
between0and176°F(‐18to80°C).Distancefromthereceiverislimitedonlyby
totalloopresistance.
2. Position: The transmitter is not position sensitive. However all standard models are originally
calibrated with the unit in a position with the pressure connection downward. Although they can be
used at other angles, for best accuracy it is recommended that units be installed in the position
calibrated
atthefactory.
3. Mounting: The transmitter can be mounted via several methods.It can be suspended from the
electrical cable, it can be placed resting on the bottom of the tank in either horizontal or vertical
orientation,oritcanbeattachedtoapipeorhangwireby
the1/2˝NPTmaleconnectiononthetopof
thehousing.
Interference:TheDeltaSpan™isdesignedtooperateunderthesurfaceoftheliquidin
thetank.Avoidinstallations where othertankrequirementswillcausethetransmitter
tomoveorswing.Forexample:amixerbladecouldcausetheleveltransmittertowhip
around within the tank.An alternative would be to move the transmitter to a more
stablesectionofthe tankortoinstalltheLD31seriesinsideastillwell/droptube.The
stillwell/droppipewillminimizetheeffectscreatedbythemixer.
Termination:The cable for the DeltaSpan™ is typically terminated at a junction box
locatedontopofthetank.Sincetheventtubeiscontainedwithinthecable,the pressure
withinthejunctionboxmustalwaysbethesameasthereference(typicallyatmospheric)
pressure for the liquid.The inside of the junction box must be clean, dry and free of
moisture.Add the optional pressure fitting (LD90‐_001 ) to complete the package.The
LD90‐_001featuresa2”NPTthreadformountingandaliquidtightconnectortosealthe
cableinterface.
Note:Use caution when sealing the cable at the top of the
tank.The ventilation tube
mustbeopenandfreetoallowairtoflowbac ktothepressurediaphragm. Avoidblocking
theventilationtube by compressingthe cable.Alwayskeep thecable terminationclean,
dryandfreeofmoistureandpreventliquidfromenteringtheventtube.
Note:A vent Filter is providedon the end ofthe vent tube.If theapplication requires
theventtubetobecuttolength,thenremovetheventfilterandplaceontheendofthenewendofthevent
tube.
Note:Forextraprotectionagainsthighhumidity environments, Flowlineoffersthe
LD90‐3000desiccantfilter
thatcanbeattachedtotheventtube.