Instruction Manual

12of14 MN301030 RevB
INSTALLATION StepNine
The LD30 series is designed to operate with only the installation thread being exposed to the fluid.Avoid
installing the level transmitter along the bottom of the tank as materials such as sludge will build up and
coat/covertheport.
1. Location:Selectalocationwherethetemperatureofthetransmitterwillbebetween0and175°F(18to
79°C). Distance from the receiver is limited only by total loop resistance. The tubing or piping supplying
pressure to the unit can be practically any length required but long lengths will increase response time
slightly.
2. Position:The transmitter is not position sensitive. However all standard models are originallycalibrated
with the unit ina position with the pressureconnection downward. Althoughthey canbe usedat other
angles,forbestaccuracyitisrecommendedthatunitsbeinstalledinthepositioncalibratedatthefactory.
3. PressureConnection:Useasmall amountofplumber’stape or othersuitable sealants toprevent leaks.
Besurethepressurepassageinsidetheportisnotblocked.
4. Electrical Connections:Wire Length‐The maximum length of wire connecting the transmitter and
receiverisafunctionofwiresizeandreceiverresistance.Wiringshouldnotcontributemorethan10%of
thereceiverresistancetototalloopresistance.Forextremelylongruns(over1000feet),choosereceivers
withhigherresistancetominimizethesizeandcostofconnectingleads.Wherewiringlengthisunder100
feet,wireassmallas22AWGcanbeused.