Instructions / Assembly

10
91194_F_INSTALL
AF PART # 91194 Rev B
PEDESTAL TO CBU INSTALLATION
METAL CBU TYPES I, II, III AND IV
PART # DESCRIPTION
86089B 3/8-16 HEX NUT
86101 3/8-16 X 1.25 CARRIAGE BOLT
91079 FLOATING SHELF
91129 PEDESTAL FOR TYPE I, II
91121 PEDESTAL FOR TYPE III, IV
86097 3/8” X .688 OD LOCK WASHER
REQUIRED TOOLS
9/16” SOCKET WRENCH
OPEN MASTER LOADING DOORS.
REMOVE LEFT AND RIGHT SIDE 91079
FLOATING SHELVES, EXPOSING
MOUNTING HOLES.
PLACE UNIT ON PEDESTAL.
FROM UNDERNEATH UNIT, INSERT FOUR
(4) 86101 3/8-16 X 1.25 CARRIAGE BOLTS
UPWARD.
FROM INSIDE PARCEL COMPARTMENTS,
ADD FOUR (4) 86097 3/8” X .688 OD
LOCK WASHER AND TIGHTEN FOUR (4)
86089B 3/8-16 HEX NUTS. TORQUE TO 22
FOOT-POUNDS.
REPLACE LEFT AND RIGHT SIDE 91079
FLOATING SHELVES.
1.
2.
3.
4.
5.
6.
1570 “F” SERIES