Installation Guide
www.orencemailboxes.com
Page 10 of 16
91194 Rev E
PART # DESCRIPTION
86089B 3/8-16 HEX NUT
86101 3/8-16 X 1.25 CARRIAGE BOLT
91079 FLOATING SHELF
91129 PEDESTAL FOR TYPE I, II, V
91121 PEDESTAL FOR TYPE III, IV, VI
86097 3/8” X .688 OD LOCK WASHER
REQUIRED TOOLS
9/16” SOCKET WRENCH
Open master loading doors until hold open arm engages.
Remove left and right side 91079 floating shelves, exposing mounting holes in
base of unit.
Place unit on pedestal.
From underneath unit,insert four(4) 86101 carriage bolts upward.
From inside parcel compartments, add four(4) 86097 lock washers and tighten
four(4) 86089B hex nuts. Torque to 22 foot-pounds.
Replace left and right side 91079 floating shelves.
Close master loading doors by first lifting slightly on the master hold open arm and
then shutting each door.
Installation of unit is now complete. Contact local USPS personnel to install Arrow
Locks and place unit into service.
PEDESTAL TO CBU CABINET INSTALLATION
vital
™
cluster box unit - 1570 “F” Series
1.
2.
3.
4.
5.
6.
7.