Installation Guide
Page 30 of 36 versatile™ 4C Installation Manual -- 206362 -- Rev A
www.orencemailboxes.com
PARCEL ARROW LOCK INSTALLATION
(FRONT AND REAR LOADING)
1 .
Open the parcel door and turn the key to place the parcel door customer lock in the locked
position.
• The parcel door customer lock must be in the locked position for the key to be
removed.
2 .
Slide the parcel door lock stiffener (64042) onto the parcel door bolts as oriented in the
illustration.
3 .
Install the Arrow lock as shown using four (4) #10-32 thin lock nuts (86455).
• The nuts should be tightened to ensure a snug fit.
• Overtightening may keep the Arrow lock from operating correctly.
4 .
Install the parcel door Arrow lock cover (64216) using two (2) #10-32 x 5/16” button-head
McGard security screws (84993).
• These screws require a McGard Screwdriver (see tool information on p. 7).
NOTE: Arrow lock is installed by USPS Postal Service Personnel ONLY.
• Contact your local post office to arrange acquisition and installation
of Arrow lock.
NOTE: Private master access lock for private versatile™ 4C mailboxes is
installed at the factory.
• If field installation is required, use the Postal to Private Conversion Kit
(CK25750).
versatile™ 4C mailbox suites