Installation Instructions
Table Of Contents
- Chapter 1 Important information
- Certified Installation
- Transmitted power density levels
- IEEE statement
- ICNIRP Guidelines
- Water ingress
- Disclaimer
- EMC installation guidelines
- Suppression ferrites
- Connections to other equipment
- Compass safe distance
- Declaration of Conformity (Cyclone)
- Declaration of Conformity (Cyclone Pro)
- Declaration of Conformity (VCM100)
- Radar licensing
- FCC Notice - Radar
- FCC Approval codes
- ISED Canada approval codes
- IMO and SOLAS
- Warranty registration
- Product disposal
- Technical accuracy
- Operation instructions
- Chapter 2 Document information
- Chapter 3 Product and system overview
- Chapter 4 Parts supplied
- Chapter 5 Product dimensions
- Chapter 6 Location requirements
- Chapter 7 Cables and connections
- Chapter 8 Installation
- Chapter 9 System connections
- Chapter 10 Power connections
- Chapter 11 System checks
- Chapter 12 Operation
- Chapter 13 Troubleshooting
- Chapter 14 Technical support
- Chapter 15 Technical specification
- Chapter 16 Spares and accessories
- Blank Page
RadarconnectedusingRayNetswitch
Note:
Somepowerconnectionsareomittedfromthisillustration.Thenetworkswitchandmultifunction
displayeachrequireadedicatedpowerconnection.
Important:
Fuses(notsupplied)arerequiredforcircuitprotectionfortheCycloneRadar:
12Vdc
•15Athermalfuseatbreaker(x1)
•20AinlinefuseonREDpowercable(x1)
24Vdc
•8Athermalfuseatbreaker(x1)
•10AinlinefuseonREDpowercable(x1)
1.CycloneOpenArrayRadar
2.MFD
3.RayNetnetworkswitch
4.Cyclonepowercable
5.VCM100powerconverter
6.RayNetRadardatacable
Systemconnections
55