Installation Instructions
Table Of Contents
- Chapter 1 Important information
- Certified Installation
- Transmitted power density levels
- IEEE statement
- ICNIRP Guidelines
- Water ingress
- Disclaimer
- EMC installation guidelines
- Suppression ferrites
- Connections to other equipment
- Compass safe distance
- Declaration of Conformity (Cyclone)
- Declaration of Conformity (Cyclone Pro)
- Declaration of Conformity (VCM100)
- Radar licensing
- FCC Notice - Radar
- FCC Approval codes
- ISED Canada approval codes
- IMO and SOLAS
- Warranty registration
- Product disposal
- Technical accuracy
- Operation instructions
- Chapter 2 Document information
- Chapter 3 Product and system overview
- Chapter 4 Parts supplied
- Chapter 5 Product dimensions
- Chapter 6 Location requirements
- Chapter 7 Cables and connections
- Chapter 8 Installation
- Chapter 9 System connections
- Chapter 10 Power connections
- Chapter 11 System checks
- Chapter 12 Operation
- Chapter 13 Troubleshooting
- Chapter 14 Technical support
- Chapter 15 Technical specification
- Chapter 16 Spares and accessories
- Blank Page
8.4Mounting
Cyclone
Mountingthepedestal
Beforemountingtheunit,ensurethatyouhave:
•Selectedasuitablelocation.
•Identifiedthecableconnectionsandroutethatthecableswilltake.
Important:
Preparedsuitableliftingequipmentforfixingthepedestaltothemountingplatform.Thelifting
equipmentmustbeofasuitablegaugeandstrengthcapableofbearingthepedestal'sweight
of16Kg(asaminimum),andalsocapableofpassingthroughthe20mmeyeboltholeonthe
pedestal.Additionally,youmustalsocarefullyconsidertheimpactforceontheliftingequipment,
intheeventthatthepedestalfallsbeforeitissecuredtothemountingsurface.DoNOTattachthe
antennatothepedestalpriortolifting.
1.Checktheselectedlocation.Aclear,flatplatformisrequiredformountingthepedestalunit.
Important:
Formoreinformationrefertop.31—Locationrequirements
2.Fixthesuppliedmountingtemplatetotheplatform,usingmaskingorself-adhesivetape.
Important:
Ensurethemountingtemplateisorientatedcorrectly.
3.Usinga3mmdrillbit,drillthe4holes,asindicatedonthemountingtemplate.Checkthatthe
holeshavebeendrilledinthecorrectposition.
4.Usingan11mmdrillbit,drillthroughthe4holes.
5.Ifyouplantorouteyourcablesthroughthemountingsurface,cutthecableholeoutusinga
jigsaw.
Installation45