Full Product Manual

S
TEP 1A - CONCRETE CEILING
S
WITCH OFF THE ELECTRICAL MAINS AT THE
CIRCUIT BREAKER FUSE BOX.
IMPORTANT : SCREWS & NUTS MUST BE
TIGHTENED TILL SNUG
S
TEP 1B - WOODEN CEILING
S
WITCH OFF THE ELECTRICAL MAINS AT THE
CIRCUIT BREAKER FUSE BOX.
IMPORTANT : SCREWS MUST BE TIGHTENED
TILL SNUG
3
Flat W
ashers (3)
Expansion Bolts (2)
Nuts (5)
Mounting
Bracket (1)
Spring W
ashers (4)
W
ashers (3)
Self Tapping
Screw (2)
Mounting
Bracket (1)
1) Use the Mounting Br
ack
et (1) as a guide,
mark the spots where the 4 Self Tapping
Scre
ws (2) will be drilled.
2) Remo
ve the Mounting Brack
et (1), drill 4
holes for 3MM diameter, install the mounting
br
acket onto w
ooden ceiling with the 4 Self
T
apping Screws (2) & Washers (3).
1) Use the Mounting Br
ack
et (1) as a guide,
mark the spots where the 4 Expansion Bolts (2)
will be drilled.
2) Remo
ve the Mounting Brack
et (1), drill 4
holes and insert 4 Expansion Bolts (2) into the
concrete ceiling, install the mounting br
ack
et
and secure with Flat Washers (3), Spring
W
ashers (4) and Nuts (5).
INSTALLATION INSTRUCTION