Installation Instructions

– 5 –
5. Installation of Back Wall Top Trim (G)
A. Note the height of the shower head. Decide if top trims
will be installed above or below shower head/escutcheon,
keeping in mind that trims can overlap panels from ½" to
2-1/2". Mark a level line at desired height of the top of the
trim on the back wall (above the back wall panel).j
B. Measure the distance from plumbing wall to opposite
wall (sheetrock to sheetrock, NOT FlexStone to FlexStone).
Cut item (G) to this measurement, then cut a notch ¼" wide
in both ends. This will enable the trim to overlap the back
panel and t over the end panels eliminating any large gaps
or holes in the corners.
C. Dry t this trim piece and make sure it ts properly in a
level position. Peel away protective masking from the trim,
apply adhesive to the back of the trim molding, and adhere
it over the back wall panel. Secure the trim piece in place
while the adhesive cures using paint-safe masking tape.
NOTE: Trim moldings are shaped like an "L", and the long leg is
designed to overlap panels, with the short leg returning back to
the sheetrock and hiding the panel edge. Be sure to peel protective
masking back from the edges of the panels before adhering the trim
moldings.