Installation Guide
 FlexStoneProducts.com  - 4 -         5/18 
Install Instructions 
1 INSTALLATION OF INSIDE CORNER REINFORCEMENTS (J). 
1.1) Flashing  Tape  Corner  Reinforcements  go  behind 
the panels in the back vertical corners for added 
leak protection. This tape has been cut to length, 
matching the height of the panels of your kit. 
1.2) Apply a generous bead of adhesive onto both walls 
about  3/4  inch  away  from  the  corner.  Fold  the 
flashing tape at the center crease with the print 
side together, then press the tape into the corner 
using a taping or putty type blade. Using the same 
blade, flatten out the tape to create a flat, smooth 
inside corner. Wipe away any excess adhesive. 
2 INSTALLATION OF BACK WALL PANELS (A). 
NOTE: It is not necessary to cut the top edges of panels to be level, 
as they will be covered by trim moldings. 
2.1) The back panel must be fit to both the left and 
right  corners,  and  to  the  tub  or  shower  base. 
Keep in mind  that walls may not be square or 
plumb, so you will want to measure width of the 
alcove at both the bottom and top of the alcove 
prior to trimming panel. (See TIP on right for a 
technique for achieving good fit measurements.) 
Trim the panel to size with a utility knife, jigsaw, 
or  power  plane  and  dry  fit  until  a  tight  fit  is 
achieved. 
2.2) When  satisfied  with  the  fit,  peel  protective 
masking  back  from  the  edges  of  the  panel 
(approx. 4”)  and  clean  burs  from  any  rough 
edges.  Generously  apply  Performance  Pro 
Adhesive  in  lines  or  blobs  to  the  back  of  the 
panels  in  a  pattern  every  3  to  4  inches.    Use 
approximately one 10oz tube per 8 square feet 
following any adhesive directions on tube. Push 
the panels in place, lightly pounding to achieve 
good bond. 
TIP:  Draw  a  vertical plumb  line directly on  the  middle  of  the 
sheetrock from top to bottom of wall. Now draw a horizontal level 
line crossing the plumb line  about halfway up  the wall.    Record 
measurements left from the vertical line to corner at top, middle and 
bottom (L1, L2, L3), then right from the vertical line to corner (R1, 
R2, R3.) Now record measurements down from the horizontal line 
to the tub (D1, D2, D3.) Transfer these measurements to your back 
wall panel (A).  These 9 measurements will account for out of plumb 
walls AND out of level tubs! 










