Installation Guide
Install Instructions
1.  Installation of Inside Corner Reinforcements (J)
A.  Flashing Tape Corner Reinforcements go behind the 
panels in the back vertical corners for added leak protection. 
This tape has been cut to length, matching the height of the 
panels of your kit. 
B.  Apply a generous bead of adhesive onto both walls 
about 3/4 inch away from the corner. Fold the ashing tape 
at the center crease with the print side together, then press 
the tape into the corner using a taping or putty type blade. 
Using the same blade, atten out the tape to create a at, 
smooth inside corner. Wipe away any excess adhesive.
2.  Installation of Back Wall Panels (A)
A.  The back panel must be t to both the left and right 
corners, and to the tub or shower base. Keep in mind that 
walls may not be square or plumb, so you will want to 
measure width of the alcove at both the bottom and top of 
the alcove prior to trimming panel. (See TIP on right for a 
technique for achieving good fit measurements.) Trim the 
panel to size with a utility knife, jigsaw, or power plane 
and dry t until a tight t is achieved. 
TIP: Draw a vertical plumb line directly on the middle of the sheet-
rock from top to bottom of wall. Now draw a horizontal level line 
crossing the plumb line about halfway up the wall. Record mea-
surements left from the vertical line to corner at top, middle and 
bottom (L1, L2, L3), then right from the vertical line to corner (R1, 
R2, R3.) Now record measurements down from the horizontal line 
to the tub (D1, D2, D3.) Transfer these measurements to your back 
wall panel (A). These 9 measurements will account for out of plumb 
walls AND out of level tubs!
B.  When satised with the t, peel protective masking back 
from the edges of the panel (approx. 4") and clean burs from 
any rough edges. Generously apply Performance Pro Adhesive 
in lines or blobs to the back of the panel in a pattern every 3 
to 4 inches. Use approximately one 10oz tube per 8 square 
feet following adhesive directions on tube. Push the panel in 
place, lightly pounding to achieve good bond.
NOTE: It is not necessary to cut the top edges of panels to be level, as 
they will be covered by trim moldings.
– 3 – 
L1
L2
L3
R1
R2
R3
D1 D2 D3
Vertical Plumb Line
V.2 - 3/18/2019










