User Manual

Installation and adjustment
Created by EBCCW 00:06
41
5112204
5.3 Electrical installation and controls
5.3.1 Electrical installation
During this phase all necessary cabling is connected to elevator and appli-
cation code software for controlling the elevator is downloaded to the line
controller (IPC/PLC) as well as the fieldbus hardware configuration.
Reference to the electrical documentation for the version in question.
Figure 19 Cabling example
Cabling:
Power supply
Fieldbus
Safety
Equipotential bonding
400 V AC
24 V DC
ES-loop
Fieldbus
Equipotential bonding
Module
A001