35 SEAMOUNTS This warranty offered by Seamounts covers defects in material or workmanship in new Seamounts products. This warranty extends to the original purchaser only and is non-transferable. Only consumers purchasing Seamounts products from authorized Seamounts retailers or resellers may benefit from our limited warranty. What is covered? Item No.
al}} IEEE 2a. L-Shaped 3a. L-Shaped Upper Vertical Lower Vertical Ceiling Post x4 Post Connecting . Bracket Plats Wire Grid x6 2b. Upright 3b. Upright x4 Upper Vertical Lower Vertical Post x2 Post St8.
03 Step 1: Plan the Installation Location Seamounts Installation Overview Determine if your ceiling rack will be installed parallel or perpendicular to the direction of your ceiling joists. Make sure that the distance between the vertical posts are 48" [Al Plan your Seamounts selling rack Installation location, determine orientation and verify apart. Use a stud finder to locate the Jolts If selling Is finished with drywall. spacing of Joists.
05 Step 2-A: Install Ceiling Brackets Perpendicularly 1. Use a stud finder to locate the wooden ceiling joists. Then use the installation template to mark the mounting points. 3. Install the ceiling brackets using tapping screws (6) and tighten with socket wrench. Wooden Ceiling Joists 48" a Mark the Mounting Holes Note: The installation template is reusable for marking mounting points on each side. 2. Drill a 2.4" (60mm) deep 0.18" (4.5mm) diameter pilot hole at the center of each marked point. 2.
Step 2-B: Install Ceiling Brackets Perpendicularly 1. Use a stud finder to locate the wooden ceiling joists. Then use the installation template to mark the mounting points. 3. Install the selling brackets using tapping screws (6) and tighten with socket wrench. Wooden Ceiling Joists 48" Mark the mounting holes Note: The installation template is reusable for marking mounting points on each side. 2. Drill a 2.4" (60mm) deep 0.18" (4.5mm) diameter pilot hole at the center of each marked point. 07 2.
09 Step 3: Assemble the Vertical Posts Determine hanging height and then attach upper vertical posts with lower posts using bolts (7) and nuts (8). Tighten with socket wrench (9) and hex key (10). 22" 40" (560 1010mm) Note: Make sure that the length of all the vertical posts are uniform. Upright Upper Vertical Post 20" _ 40" (560 1010mm) L-Shaped Lower Note: To avoid misalignment of holes Vertical Posts when installing screws, do not tighten any screws until all screws are loosely installed.
Step 5: Assemble and Attach Wire Grids Right Direction v Wrong Direction xX {} 1" 1.Assemble the wire grids side by side as shown in the figure, and attach them using bolts {13). Tighten with hex key (10). 2.Attach the connecting plates at the joints shown in the figure below using the bolts (13). Tighten with hex key (10). Connecting Plates Note: To avoid misalignment of holes when installing screws, do not tighten any screws until all screws are loosely installed. Then, tighten the screws one by one.
13 Step 6: Place and Attach Wire Grid 1. Insert the wire grid set. The corners of the grid fit into the slot of the L-shaped vertical posts. Tighten the screws (14) with hex key (10). 2, Attach the upright vertical posts with the side of the grid by tightening the screws (14) with hex key (10). To] Installation Tips Use of Metal Expansion Bolt The metal expansion bolt is needed if installing to a concrete ceiling (mental expansion bolts are not included). —— [2] closemouthed nut end washer.