Installation Guide
Step 1 - Option B: Attach the top wall plate to solid concrete wall
1. Place the magnetic level to the top wall plate (2). Marking the mounting holes
using the wall plate.
2. Drill a 2.8'' (70mm) deep 0.39'' (10mm) diameter pilot hole using 3/8'' drill bit at
the center of each marked point.
3. Attach the top wall plate to solid concrete wall using plastic expansion bolts (B2),
washers (B3) and lag bolts (B1). Tighten with socket wrench.
2.8'' (70mm)
Φ3/8'' (10mm)
Step 2: Assemble the upright support
1. Attach the bottom wall plate (3) to the upright support beam (1) using bolts (A) and nuts (C).
2. Attach the upright support beam (1) to the top wall plate (2).
03 04
Hammer Drill
Place the upright support flat on the
ground when attach the bottom wall
plate, for safety consideration.
Suggested Installation Height
90'' - 96" (2300mm - 2400mm)
from the floor.
90'' - 96" (2300mm - 2400mm)
D
2
Place the wall plate as
shown on the figure,
keeping the slot upside.
UP
D
x1
B1
x4
B2
x4
B3
x4
B3
B1
B2
A
C
1
3
1
2
3
A
C
C
x2
A
x2
C
x1
2