Use and Care Manual

6
PRODUCTS REQUIRED:
• Flex Paste
®
Flood Protection in a Cartridge
• Flex Tape
®
Flood Protection
• Flex Seal Liquid
®
Flood Protection
STEP #1 – APPLY FLOOD PROTECTION PASTE IN A CARTRIDGE
1. Make sure the areas being sealed are clean, dry, and free of grease, oil, dirt, and debris.
2. Cut the nib o the Flood Paste (cartridge), screw on nozzle, cut the nozzle to the desired bead
thickness, then apply an even bead of Flood Paste into the threshold and the bottom of the door.
1
3. Apply Flood Paste (cartridge) between the door and the door frame on each side of the door, making
sure all sides and corners have been sealed.
2
4. Apply Flood Paste along the bottom of the entire threshold (including screw holes), making sure that
the front, sides and corners are completely sealed. Push the Flood Paste in and smooth it out with
gloved nger or Flex Gap Filler tool.
3
5. Apply an even bead of Flood Paste along where the doorframe meets the casing as well as where the
casing meets the exterior wall. For doors with glass inserts, seal all seams where glass comes into
contact with the door.
4
6. Use gloved nger or Flex Gap Filler tool to push Flood Paste into all seams and smooth it out.
5
7. Use Flood Paste to seal around the lock set or door handle where it meets the door.
6
8. Cut a small square of Flood TAPE, peel the backing, and place over keyhole.
7
8
9. Completely cover the Flood Tape with the Flood Paste.
9
10. Smooth out the Flood Paste with your gloved nger, spreading the Flood Paste over Flood Tape
edges.
10
11. Let dry to the touch (2-6 hours*). If needed, apply additional coats of Flood Paste using the same
application process as above, with each coat being wider and overlapping previous coats.
STEP #2 – APPLY FLOOD PROTECTION LIQUID
1. Once doors have been sealed and are completely dry, use a brush to apply a generous amount of
Flood Liquid directly on top of the Flood Paste, with each coat being wider and overlapping the
previous coat. This will help seal any small openings or pinholes that may have been missed.
11
2. Once the Flood Liquid is dry to the touch (3-6 hours*), apply as many additional coats as necessary
to ensure all openings are sealed, with each individual coat being wider and overlapping the previous
coat. Let each coat dry to the touch before applying the next coat.
12
*Dry times may vary based on temperature, humidity, and thickness of applied layers.
IMPORTANT: If sealing your primary entry/exit, all persons, pets, and essential belongings must
be removed from premises. You will not be able to re-enter without breaking the seal.
Flood Paste in a Cartridge is the base coat for your rst layer of protection. Use a gloved nger, Flex
Gap Filler tool, or similar tool to push into all seams and openings to help create a watertight seal.
Always be cautious of any sharp object that may cause injury.
HOW TO SEAL

Go to: exsealproducts.com/ood for complete video instructions.
TOOLS REQUIRED:
• Caulking gun
• Paint brush
Utillity knife
• Protective gloves
& eyewear