Use and Care Manual
17
Clean area to be sealed. Apply Paste between the conduit
and the wall.
Push Paste in deep and smooth
out with gloved nger or Flex Gap
Filler tool.
Apply additional overlapping
layers of Paste, if needed.
Cover valve with towel to protect
valve from overspray.
Apply Spray on top of Paste.
Let dry and inspect for holes. If needed, apply wider coats to
overlap previous ones.
Allow to cure (24-48 hours*).
4
7
21
5
8
3
6
9