Use and Care Manual

Go to: exsealproducts.com/ood for complete video instructions.
10
TOOLS REQUIRED:
• Caulking gun
• Paint brush
• Protective gloves & eyewear
STEP #1 – APPLY FLOOD PROTECTION SPRAY
1. Make sure the areas being sealed are clean, dry, and free of grease, oil, dirt, and debris.
2. Shake the can for 30 seconds. Apply several even coats of Flood Spray to the door track, using a
sweeping motion 8” to 12” from the surface. Allow each coat to dry to the touch (30-60 minutes*)
before applying the next coat.
1
IMPORTANT: Coats that are too thick can cause bubbles, which could allow oodwaters to enter.
STEP #2 – APPLY FLOOD PROTECTION PASTE IN A CARTRIDGE
1. Cut the nib o the Flood Paste (cartridge), screw on nozzle, cut the nozzle to the desired bead
thickness, and apply directly between the track and the bottom of the doors, as well as the front and
sides of the track, including its weep holes.
2
2. Apply Flood Paste to: (a) where the door meets the frame, (b) where the frame meets the casing,
(c) where the casing meets the external wall.
3
3. Next, apply to: (a) where the glass meets the frame, (b) where the doors meet and slide past each
other, (c) and the handle.
4
4. Use gloved nger or Flex Gap Filler tool to push the Flood Paste directly into seams and smooth it
out. Let the rst coat dry to the touch (2-6 hours*).
5
5. Apply additional coats of Flood Paste as needed to ensure all gaps and holes have been lled.
Each layer should be dry to the touch before the next application, with each coat being wider and
overlapping the previous coat.
6
STEP #3 – APPLY FLOOD PROTECTION LIQUID
1. Pour a light, even coat of Flood Liquid directly into the sliding glass door track. Our Flood Liquid is
self-leveling and will seep in and ll all the hard-to-reach areas, as well as those you can’t see.
7
2. Once dry to the touch (3-6 hours*), brush a generous amount of Flood Liquid directly on top of the
previous layers of Flood Paste and Flood Liquid, with each coat being wider and overlapping the
previous coats. This will help seal any small openings or pinholes.
8
3. Apply additional coats as needed. Let each coat dry to the touch before applying the next coat.
9
*Dry times may vary based on temperature, humidity, and thickness of applied layers.
PRODUCTS REQUIRED:
• Flex Paste
®
Flood Protection in a Cartridge
• Flex Seal Liquid
®
Flood Protection
• Flex Seal
®
Spray Flood Protection
HOW TO SEAL
SLIDING DOORS
Flood Paste in a Cartridge is the base coat for your rst layer of protection. Use a gloved nger, Flex
Gap Filler tool, or similar tool to push into all seams and openings to help create a watertight seal.
Always be cautious of any sharp object that may cause injury.