User's Manual
Table of C ontents
TABLE OF CONTENTS
Chapter 1. Overview........................................................................................ 1 -1
1.1. Installation Equipment..........................................................................1 -2
Chapter 2. Verifying the Site Preparation ................................................................ 2 -1
2.1. Site Prepa ration Check list — Outdoor Base Station........................................ 2 -1
2.2. Preparing the Floor .............................................................................. 2 -2
Chapter 3. Installing the Cabinet.......................................................................... 3 -1
3.1. Removing the Cabinet from the Pallet........................................................3 -1
3.2. Lifting the Cabinet ..............................................................................3 -5
3.3. Mounting the Cabinet to the Concrete........................................................3-6
Chapter 4. Connecting the Power S ystem ............................................................... 4 -1
4.1. Routing the Power Cable.......................................................................4-1
4.2. Connecting the Power Cable ................................................................... 4 -3
4.3. Connecting the Ground C able ................................................................. 4 -4
Chapter 5. Connecting the Core Network C able s....................................................... 5 -1
5.1. Routing the T1 Cables .......................................................................... 5 -1
5.2. Connecting the T1 Cables ...................................................................... 5 -3
Chapter 6. Connecting the Antennas ..................................................................... 6 -1
6.1. Connecting the Antenna Cables ............................................................... 6 -3
Chapter 7. Powering Up the Cabinet .....................................................................7 -1
7.1. Powering Up the Cabinet....................................................................... 7 -2
Chapter 8. Powering Down the Cabinet.................................................................. 8 -1
8.1. Powering Down the Cabinet ................................................................... 8 -2
Chapter 9. Verifying the Installation...................................................................... 9 -1
LIST OF TABLES
Table 5-1: Network Connection Pin Placement......................................................... 5 -6
Table 7-1: Power On Expec ted LEDs .................................................................... 7 -7
LIST OF FIGURES
Figure 2-1: Clearance Hole in Base of Cabinet .........................................................2 -2
Figure 2-2: Clearance Holes in Cabinet Base — Bottom View.......................................2 -3
Figure 3-1: Outdoor Cabinet Rear Screw Panels ....................................................... 3 -2
Figure 3-2: Side Screw Panels............................................................................. 3 -2
Figure 3-3: Battery Tray — Front View..................................................................3 -3
Figure 3-4: Battery Tray Open ............................................................................ 3 -4
Figure 3-5: Eyebolts for Lifting Cabinet.................................................................3 -5
Figure 4-1: Power Cable Entry — Rear View...........................................................4 -1
© 2005 Flarion
Flarion Proprietary and Confidential
Version 1.3
viii