User's Manual
Outdoor Base Station Site Preparation Punchlist
APPENDIX A.
Outdoor Base Station Site Preparation
Punchlist
Site Preparation It ems If Okay or Describe Outage
Environment
Clearanc e: 24” front, 12” side, 24” re ar
Cement slab for m ounting c abinet
Electrical system
240 VAC Service
External Se rvice Entrance w/m ain breaker
and surge suppressor
Ante nna p lant
Mounting plate with antenna connectors
T1 connection
Network Interface Unit in Demarc point
Surge suppressor installed
Cables
AC power cabling: #12 AWG THHN or
THWN — length to reach ca binet plus 36”
Ground cabling to m aste r ground bar: #6 to
#2AWGTHHNorTHWN
RF cabling — Andrews 1/2” SuperFlex
jumpers — length to reach cabinet plus 24”.
Color coded.
T1 cabling — 100 ohm twisted pair —
length to reach ca binet plus 36”
Signatures:
(Nam e, Title) Comp any Date
Witness: (Name, Title) Company Date
© 2005 Flarion
Flarion Proprietary and Confidential
Version 1.3
Page A-1