Chapter 9. Verifying the Installation
Verifying the proper installation of the cabinet must be done before the installation can be
considered complete.
Verify that all of the following re quirements are met:
Clearance requirements are met at least 24” front, 12” side, and 24” rear. There must be
room to open the cabinet door s for service.
The base station is powered up. All the LEDs in Table 7 .1 Power On Expec ted LEDs must
reflect the states listed in the table. The system should remain in the powered up state. I f it
is nec essary to power down the base station, do so only in acc ordance with the instructions in
Chapter 8. Powe ring Down the Cabinet .
Correct terminations have bee n m ade on all T1 cables.
No kinks are present in the RF cables.
RF cable m a rkings ma tch those specified in Chapter 6. Connec ting the Antennas.