Powering Up the Cabinet
Chapter7.PoweringUptheCabinet
The cabinet require s AC powe r to operate. Before attem p ting to power up the cabinet, verify that
AC power is available. It m a y be necessary to wait for a maintenance window to connec t the
cabinet to AC power and perform this procedure.
WARNING:
ALL POWER OPERATIONS SHOULD BE PERFORM ED BY QUALIFIED
PERSONNEL ONLY. BEFORE ATTEMPTING TO POWER UP THE
SYSTEM, CONFIRM THAT ALL POWER CONNECTIONS HAVE BEEN
MADE PR OPERLY.
The base station is pow ere d up using the AC circuit breakers shown in Figure 7-1: AC Load
Center— Rear View and the DC circuit breakers shown in Figure 7-2: DC Powe r Distribution
Panel — Front View.