User's Manual

Chapter 5: Connecting the Core Network Cables
2.
Route the cable through the existing cable grip in the T1 term ination box as shown in Figure
5-4: T1 Termination Box Open. Seal by tightening the ca ble grip seal nut.
Figure 5-4: T1 Termination Box Open
3.
Choose an installation method. To install using RJ-48 plugs, go to Step 4. To install using
the 66–block, go to Ste p 5.
4.
To install T 1 using R J-48 plugs:
4.a.
Remove the jumper ca bles from the 66–block.
4.b.
Insert the plugs in the connectors t o the right of the 66–block. B egin with port 1 on
top and continue down for additional ports. Up to 4 T1 ports m ay be connec ted. Refer
to the diagram in Figure 5-5: T1 Connections on 66–Block.
RadioRouter® Base Station Outdoor I nstallation Guide © 2005 Flarion
Flarion Proprietary and Confidential
Page 5-4