User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
v
TABLE OF CONTENTS
1. Overview.....................................................................................Page 1
1.1. Installation Equipment ...............................................................Page 2
2. Verifying the Site Preparation ............................................................Page 3
2.1. Si te Preparation Checklist — Outdoor BaseStation.............................Page 3
2.2. Preparing t he Floor ...................................................................Page 3
3. Installing the Cabinet ......................................................................Page 6
4. Connecting the Power System ......................................................... Page 12
5. Connecting the Core Network Cables................................................. Page 18
6. Connecting the Antennas ............................................................... Page 24
7. Powering Up the Cabinet................................................................ Page 28
8. Powering Down the Cabinet ............................................................ Page 33
9. Verifying the Installation ................................................................. Page 35
LIST OF PROCEDURES
Procedure 3-1 R emoving th e C abinet from the Pallet ...................................Page 6
Procedure 3-2 Lifting the Cabinet ......................................................... Page 10
Procedure 3-3 M ounting the Cabinet to the Concrete ................................. Page 11
Procedure 4-1 Routing the Power Cable................................................. Page 12
Procedure 4-2 C onnecting the Power Cable ............................................ Page 14
Procedure 4-3 Connecting the Ground Cable........................................... Page 15
Procedure 5-1 Routing the T1 Cables.................................................... Page 18
Procedure 5-2 C onnecting the T1 C a bles ............................................... Page 20
Procedure 6-1 Connecting the Antenna Cables ........................................ Page 26
Procedure 7-1 Powering Up the Cabinet................................................. Page 30
Procedure 8-1 Powering Down the Cabinet ............................................. Page 33
LIST OF TABLES
Table 7.1 Power On Expected LEDs...................................................... Page 32
LIST OF FIGURES
Figure 2.1 Clea rance Hole in Base of Cabinet............................................Page 4
Figure 2.2 Clearance Holes in RadioRouter Base — Bottom View....................Page 5
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
v