User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page B-1
APPENDIX B
Outdoor BaseStation Installation Punchlist
Installation Items
If Okay
OR Describe Outage
Overall
Cabinet is physically intact
RadioRouter Chassis
MCU
BHU
PCU
BBU
TXU
RXU
AIU
LNA/Duplexers
Power Subsystem
T1
Antenna Connections
Battery
Other
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
Page B-1