Chapter 9. Verifying the Installation
Verifying the proper installation of the cabinet must be done before the installation can be
considered complete.
Verify all of the following items:
1. Clearance requirements are met at least 24” front, 12” side, and 24” rear. There must be
room to open the cabinet doors for service.
2. The base station is powered up. All the LEDs in Table 7.1 Power On Expected LEDs must
reflect the states listed in the table. The system should remain in the powered up state. If it
is necessary to power down the base station, do so only in accordance with the instructions
in Chapter 8. Powering Down the Cabinet.
3. Correct terminations on all T1 cables.
4. No kinks in RF cables.
5. RF cable markings match those specified in Chapter 6. Connecting the Antennas.