User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 34
• RRC breaker
• Battery breakers
8.
Turn off the AC breakers beginning with the bottom right breaker as follows. See Figure 7.3
Turning AC Breakers On.
• Rectifier #3
• Rectifier #2
• Rectifier #1
• Battery Heater
• Continuing with the bottom left breaker: Heat Exchanger
• Heater
• Surge Suppressor
• Utility Outlet
RadioRouter
®
BaseStation Installatio n Gu ide — Draft
Version 0.2 - © 2003 Flarion
Flarion Confidential
Page 34