User's Manual
Table Of Contents
- toc
- Issue Date: 09- 23- 2003
- Overview
- 1.1. Installation Equipment
- Verifying the Site Preparation
- 2.1. Site Preparation Checklist •24 Outdoor BaseStation
- 2.2. Preparing the Floor
- Installing the Cabinet
- Connecting the Power System
- Connecting the Core Network Cables
- Connecting the Antennas
- Powering Up the Cabinet
- Powering Down the Cabinet
- Verifying the Installation
- RadioRouter Outdoor BaseStation Site Preparation Punchlist
- Outdoor BaseStation Installation Punchlist
- tables
Page 31
3.
On the DC power distribution panel, m ake sure that the Low Voltage Disconnect switch is
settoAUTOMATIC.SeeFigure 7.4 Low Voltage Disconnect.
Figure 7.4 Low Voltag e Disconnect
4.
Turn on the Battery Disconnect breaker. The Batter y Disconnect breaker is on the left as
you face the front of the cabinet. See Figure 7.5 DC Battery Breakers.
Figure 7.5 DC B attery Breakers
RadioRouter
®
BaseStation Installation Guide — Draft
Version 0.2 - © 2003 F larion
Flarion Confidential
Page 31